Guidelines for the development of comprehensive marketing policies for municipal electricity undertakings, with particular emphasis on load management.
Date
1986
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
It is expected that South Africa will have to construct as much generating
capacity in the next five years as has been constructed over the past 50
years. Industrialization and urbanization dictates that the larger portion
of this increase will be required in the supply areas under the control
of Municipal Electricity Undertakings, which means that these undertakings
will have to anticipate rapid growth in their infrastructures. This will
put a tremendous strain on their resources of revenue, materials and labour,
and it is obvious that comprehensive and co-ordinated policies are required
to be developed to enable these undertakings to deliver the electrical
energy to the final consumers at the lowest possible cost.
The Electricity Undertaking is a business organization with unusually
difficult managerial problems in all its functional areas. Its personnel
are adversely affected by the vast area of supply and by the resulting
difficulty of direct supervision and control. The capital cost of electrical
equipment is high, and there may be a tendency to reduce the initial cost
by ignoring the long term costs associated with the selection of equipment.
Electricity pricing is very difficult, as electricity is not a uniform
product. The consumption patterns of the consumers causes severe peaking
of loads to occur, resulting in very low utilization )f the capital equipment
involved, and which can threaten to overload existing networks. These
problems are compounded by the fact that the undertaking is a monopoly
and as such is not driven by the free-market motivating forces, such as
a profit motive and the constant need to improve to meet competition.
There is thus no motive to seek optimum solutions to the many problems.
It is shown that the Load Factor is an indication of the efficient use
of scarce resources, and that it is similar to measurements of profitability,
such as Return-on-Investment, etc. It is therefore possible to replace
the missing drive for profit and product improvement by the need to constantly
improve the load factor. By making this the main objective of the undertaking
many of the stated problems are put in their correct perspective. Maintenance
becomes important, as power failures adversely affect the load factor.
More care is exercised in equipment selection, as long term energy losses
are taken into account. Electricity pricing and its effect on consumer
consumption patterns becomes important. The concerted effort to improve
the load factor is referred to as load management.
Due to the tremendous increase in electricity consumption which is expected
over the next decade it is certain that load management will play an ever
increasing role. Load Management is defined as the sustained attempt
at modifying the load curve. Soft load management refers to pricing policies
and incentive schemes designed to induce users to shift their loads .out
of the peak periods. Hard load management physically switches customer
loads.
This thesis examines the results obtainable from various methods of load
management including off-peak incentive tariffs, on-peak-reduction rebates,
the use of current limiters, peak load reduction by means of voltage reduction
and remote control of water heater cylinders.
It is shown that whereas Sasolburg saves around R7S0 000.00 p.a. and Randburg
saves over Rl,5-million p.a.,other towns such as Pretoria and Pietermaritzburg
find their geyser control systems ineffective, and are phasing them out.
It has hitherto not been possible to determine the actual savings which
would result from the installation of a geyser control system, or to determine
the optimum number of controlled geysers.
The result was that some undertakings would install a control system at
considerable expense which resulted in minimal savings, while other towns
forego the opportunity to save hundreds of thousands of rands in reduced
demand charges.
In this thesis, the author develops a feasibility study model which permits
the system load curve to be analysed and the viability of a geyser control
system to be determined. The model was tested against the controlled
and uncontrolled load curves of Somerset West, and was found to be accurate.
It was shown that a geyser control scheme is a very viable proposition
for those undertakings where the feasibility study shows a contribution
of more than 0,5 KVA per geyser towards peak load reduction.
This forms the basic guideline for the selection of an appropriate form
of load mangement, and guidelines are presented to develop supporting
policies in all fields of the undertakings' functions.
In order to facilitate correct decision-making and to assist in the development
of comprehensive policies, a database of concepts and models is presented
in the various fields and various misconceptions are dicussed.
The guidelines have been applied by several electricity undertakings.
By using the Feasibility Study Model it was shown that the proposed installation
of 4000 geyser control units at Oudtshoorn, at a cost of over RI-million,
was not viable. The Feasibility Study Model permits the savings to be
calculated for different numbers of geysers and it was shown that the
system saturates at about 1500 controlled geysers. By reduci ng the number
of controlled geysers to around 1500 the installation cost will be reduced
by about R500 000.00 and the system will show a net operating savings , "
of RI05 540.00 in the first year, increasing as ESCOM increases its tariffs.
The application of these principles conceivably prevented the needless
expenditure of RI-million on a system that would have run at an operating
loss of over R17 000.00 p.a.
The feasibility study model was applied to the Stanger load curve to determine
the correct selection of load management. The results indicate excellent
response to geyser control, and showed that a system controlling 2500
geysers, costing R498 500.00 would show a gross savings of R297 000.00
in the first year, rising to RSI0 000.00 within 5 years if ESCOM increases
its tariff by 10% p.a. Based on these results and recommendations the
Department of Finance gave ad hoc approval to the Borough of Stanger for
the additional expenditure in the current financial year to install the
control equipment.
The guidelines indicated a similar result for Tongaat, where the gross
savings would be R360 000.00 in the first year, increasing to R637 680.00
within 5 years if ESCOM increases its tariff by 10% p.a. The estimated
cost of the control equipment is R493 649.00.
In complete contrast, the feasibility studies for geyser control undertaken
on the Ballito load curve showed a contribution of less than 0,5 KVA per
geyser, which indicated that the alternative forms of load management
should be implemented.
The results are contained in the case studies.
Description
Thesis (DBA)-University of Durban-Westville, 1986.
Keywords
Loading and unloading., Materials handling., Marketing--Management., Theses--Business administration.